After an emergency is declared

The standby button is the beginning of the response, not the command centre. This guide describes the implemented path beyond it, who can act, and where the current limits are.

1 · Raise the alarm

Choose what is happening

A signed-in project member selects a scenario and can name the location. A drill is explicitly marked as a drill; it follows the response controls too. The first button opens this choice rather than silently dispatching outside responders.

What is recorded?

The emergency belongs to the project, with its scenario, declaration time, declaring person and initial command-log entry. Active project members form the initial accountability roll. People are not assumed safe.

2 · Get people accounted for

Workers check in; command sees the roll

Connected project screens can switch to the emergency view. People record “I'm safe” or “I need help”; their own response is distinguished from a supervisor marking them. They can update their status later.

Who is actually on site?

The present roll uses active project membership. It does not establish who is physically on site. Site sign-in and reliable live location are still missing inputs; project headcount must not be presented as measured site occupancy.

3 · Establish command

A named incident commander and response teams

Authorized supervisors can assign an incident commander and assign members to first aid, search and rescue, evacuation marshal, or gate and traffic teams. The command view shows who has each assignment and counts not checked in, need help, missing, safe and responders.

Who can change command?

Command actions are checked separately from a worker's right to raise the alarm or report their own status. Assigning a new incident commander removes the previous assignment's command authority. Assignments are records, not proof that a person received, accepted or completed the work.

4 · Coordinate the response

Order evacuation and receive field reports

Command can record an evacuation order and see status changes and reports from the field. Members can submit position markers, voice recordings and photographs. A supervisor-designated hospital can be shown; a live driving route depends on its provider being available.

Latest implementation batch: command maps field reports that contain geographic coordinates, with selectable pins linked to the reporter, time and source note. Coordinate text remains available when the map cannot load. This has passed isolated UI checks and a production build; it has not yet been captured here or accepted on live devices. Worker positions and CAD alignment remain separate work.

What does “alerted” mean?

It currently means an on-platform screen update, not confirmed delivery to every person. Text and push notifications are not connected. An offline or signed-out device is not guaranteed to receive the alert. The platform does not call 911. External dispatch and responder arrival cannot be inferred from a saved assignment.

5 · Stand down

Record the all-clear decision

An authorized person confirms all clear. The emergency closes, the actor and time remain in the command log, and emergency-specific outside-responder links are closed. Failed stand-down requests leave the command view active.

What remains incomplete?

The present all-clear action does not enforce that every person is accounted for before closure. A complete accountability, unresolved-help and handover gate still needs implementation and acceptance. Recorded drill timings and follow-up actions exist, but a complete response-to-recovery demonstration is still needed.